Warm Water Pool Demolition Work (5-Day Work Week System)
Contracting organization: 愛知県小牧市
1. OverviewDemolition work for the Komaki Municipal Warm Water Pool, including removal of on-site buildings (piles, electrical equipment, and mechanical equipment attached to the buildings), on-site structures, paving, planting, and rainwater piping, as well as post-demolition site preparation.Building Area: 5,022 m²Total Floor Area: 6,660 m²Structure: Basement 1, Above Ground 2, RC structure with partial Steel structure2. Project PeriodJanuary 5, 2027 – June 22, 20283. Bidding ProcedurePost-qualification restricted open competitive bidding (Comprehensive Evaluation Method) using a Specified …