Public Sewer Pipeline Reconstruction Work (11th Section)
Contracting organization: Sayama City, Saitama
1. Items Subject to Bidding Construction Name: Public Sewer Pipeline Reconstruction Work (11th Section) Construction Location: Areas around Aza Mizuno, Sayama City Construction Period: From the contract date to March 26, 2027 Construction Overview: Pipeline rehabilitation work (inner diameter φ200 mm, L = 223 m) Pipeline rehabilitation work (inner diameter φ250 mm, L = 35 m) Pipeline laying work (inner diameter φ200 mm [VU], L = 139 m) Pipeline laying work (inner diameter φ250 mm [VU], L = 28 m) No. 1 assembly manhole installation work (11 locations) Incidental work (1 set) Structure demoliti…