General National Route 42 Water Pipe Replacement Construction (Civil Engineering)
Contracting organization: Shingu City, Wakayama Prefecture
1. Overview of Construction(1) Fiscal Year/Construction Number: Reiwa 8, Shin-Suiko No. 1(2) Construction Name: General National Route 42 Water Pipe Replacement Construction (Civil Engineering)(3) Location: Within 2-chome, Ohashidori, Shingu City(4) Scope: Pipeline excavation (71 m3), backfilling (sand, 31 m3), backfilling (RC-40, 63 m3), surface layer work (dense-graded asphalt t=3cm, 101 m2), asphalt pavement cutting (306 m), asphalt pavement demolition (56 m2), surplus soil disposal (93 m3)(5) Term: From the day following the contract date to March 31, Reiwa 9 (237 days)(6) Estimated Price…