Water Pipe Replacement Construction for Shingu City Road Hidaka-cho Maruyama-cho Line
Contracting organization: Shingu City, Wakayama Prefecture
1. Overview of Construction(1) Fiscal Year/Construction Number: Reiwa 8, Shin-Suiko No. 5(2) Construction Name: Water Pipe Replacement Construction for Shingu City Road Hidaka-cho Maruyama-cho Line (Civil Engineering)(3) Location: Maruyama, Shingu City(4) Scope of Work: Pipeline excavation 92 m3, Pipeline backfill (sand) 35 m3, Pipeline backfill (RC-40) 53 m3, Surface course (dense-graded asphalt t=3cm) 105 m2, Asphalt pavement cutting 320 m, Asphalt pavement demolition 105 m2, Surplus soil disposal 93 m3(5) Construction Period: From the day following the contract date to March 31, 2027 (237 …